Ground-mounted, utility-scale PV projects on open land. We handle land assessment, grid connection studies, design, full EPC construction, and long-term performance monitoring.

200+
MWp field solar
delivered and operational
400+
Hectares covered
across three markets
35yr
Design life
standard for all field assets
3
Countries
NL · BE · DE
What We Do

Open land, maximum yield

Field solar parks are the most efficient way to deploy large-scale renewable generation. Without the structural constraints of rooftops or carports, ground-mounted systems can be optimally tilted, spaced, and oriented for maximum annual energy yield.

Eturn delivers field solar projects from 500 kWp to 50+ MWp — managing everything from land eligibility assessment and grid connection studies through to construction, commissioning, and multi-decade operations.

Field solar performance benchmarks
Yield vs. P50 estimate102%
Grid availability uptime99%
Performance ratio (PR)84%
CO₂ offset vs. gas peaking94%
Key Benefits

Why field solar delivers the strongest energy economics

Maximum Yield

Optimal Orientation

Without structural constraints, every row and string can be precisely tilted and oriented for maximum irradiation capture — delivering 10–20% more yield than equivalent rooftop systems.

Grid Revenue

Feed-in & PPAs

Field solar parks are the preferred asset class for long-term Power Purchase Agreements (PPAs) and subsidy programmes. We support offtake negotiations alongside the EPC contract.

Land Use

Agrivoltaics Compatible

Field solar can coexist with agricultural activities — sheep grazing, wildflower habitats, and agrivoltaic crop cultivation under elevated panel rows maximise land value.

Scalability

Modular Expansion

Field parks are designed for phased development. Phase one can be operational while phase two is under permitting, spreading capital outlay and accelerating revenue.

Installation Types

Three proven mounting approaches

Fixed-Tilt Ground Mount
Fixed Tilt

Fixed-Tilt Ground Mount

The most cost-effective mounting solution for large-scale parks. South-facing at optimal tilt angle for the site latitude, with concrete or driven-pile foundations depending on soil conditions.

  • Galvanised steel racking
  • Driven or concrete pile
  • Optimised for site latitude
  • 25+ year structural warranty
Single-Axis Tracking
Single-Axis Tracker

Single-Axis Tracking

Horizontal trackers that follow the sun from east to west, delivering 15–25% additional annual yield over fixed-tilt systems. Recommended for sites in higher-irradiation zones.

  • 15–25% yield uplift
  • East-west rotation
  • Wind stow algorithm
  • Remote tracker control
Solar + BESS Hybrid Park
Hybrid Storage

Solar + BESS Hybrid Park

Ground-mounted PV combined with co-located battery storage. Enables dispatchable generation, grid services participation, and maximised revenue under time-of-use pricing regimes.

  • DC-coupled architecture
  • Capacity market eligible
  • SCADA integration
  • Single EPC contract
Our Process

From land to live generation

Field solar projects require specialist expertise across land, grid, planning, and construction. Eturn holds all these capabilities in-house — eliminating the risk of handoffs between separate advisors and contractors.

01

Land & Grid Assessment

We evaluate land eligibility (soil, slope, shadow, flood risk), grid connection distance, and available DSO capacity before any commitment is made.

02

Energy Yield Modelling

Bankable PVsyst P50/P90 reports, shadow analysis, and soiling loss assessment to underpin project financing and PPA negotiations.

03

Planning & Grid Connection

Full planning application management, grid connection agreement negotiation, and environmental impact assessment across all three markets.

04

EPC Construction

Civil works, pile installation, racking, cabling, inverter station, grid connection, and commissioning — all under a fixed-price contract.

05

Long-Term O&M

24/7 SCADA monitoring, scheduled preventive maintenance, vegetation management, security patrols, and insurance-grade reporting for asset owners and lenders.

Ready to start?

Start with a free land & grid feasibility study

Share the parcel coordinates and we'll assess land eligibility and grid connection potential within 5 working days — at no cost.