About This Project

Fitting 1,167 solar panels onto two stalls in Groningen required a precise layout to maximize the available roof space. By finding the optimal placement along the single street, we turned the dressage stable into a significant power source.

The installation now provides a capacity of 0.5 MWp. This setup allows the facility to generate its own clean electricity directly on-site, making the most of the existing structures without needing extra land. It is a straightforward solution for the owner to manage energy costs and run a cleaner stable.

VCA Certified
InstallQ
PV CYCLE
NEN
ISO Certified
ETURN Delivery

From concept
to commissioning.

01360° site research & engineering
02Procurement & logistics
03Installation by certified crew
04Grid connection & commissioning
05ETURN Live — 24/7 monitoring
Previous

Rooftop

Pension Stable

Next

Rooftop

Machine Factory

Start Your Project

Ready to realise
your energy transition?

Whether it's a rooftop, a field, a carport structure or a battery storage system — ETURN delivers tailored, turnkey EPC solutions with a production guarantee.