About This Project

Installing 3,040 solar panels on the roof of this steel processing factory in Zeeland was a solid project. We focused on utilizing the expansive roof area to generate a steady stream of local energy.

The system provides 1 MWp of power capacity, allowing the facility to offset a significant portion of its heavy electricity usage. It is a straightforward setup that helps the factory lower its operational costs by producing clean energy directly on-site.

VCA Certified
InstallQ
PV CYCLE
NEN
ISO Certified
ETURN Delivery

From concept
to commissioning.

01360° site research & engineering
02Procurement & logistics
03Installation by certified crew
04Grid connection & commissioning
05ETURN Live — 24/7 monitoring
Previous

Rooftop

Tinallinge Dairy Farm

Next

Rooftop

Storage and Handling

Start Your Project

Ready to realise
your energy transition?

Whether it's a rooftop, a field, a carport structure or a battery storage system — ETURN delivers tailored, turnkey EPC solutions with a production guarantee.