Solar panels on Gigafactory Berlin
Capacity
6 MWp
Panels
14,958 panels
Location
Berlijn
Country
Germany

Solar panels on Gigafactory Berlin

About This Project

Installing 14,958 solar panels on the Gigafactory in Berlin was a massive undertaking. We focused on maximizing the roof space to support the site's transition toward carbon-neutral production.

The finished system now provides 6 MWp of clean energy. It’s a practical setup that allows the facility to generate power directly on-site, cutting down on electricity costs while keeping the assembly lines running efficiently.

VCA Certified
InstallQ
PV CYCLE
NEN
ISO Certified
ETURN Delivery

From concept
to commissioning.

01360° site research & engineering
02Procurement & logistics
03Installation by certified crew
04Grid connection & commissioning
05ETURN Live — 24/7 monitoring
Previous

Greenhouse

Solar panels on Greenhouse, Heinenoord

Next

Rooftop

Sustainable logistics center with solar roof

Start Your Project

Ready to realise
your energy transition?

Whether it's a rooftop, a field, a carport structure or a battery storage system — ETURN delivers tailored, turnkey EPC solutions with a production guarantee.